
Start with a Clean Wall
Remove all debris, old shelves, hooks or anything on the wall. A clean flat wall provides an excellent starting point for your FLOW installation.

Start Locate your Studs
Using a stud finder, locate all of the studs behind your drywall. Make both the inside and outside edges of the studs.

Map your Wall
Using a long t-rule and a level, accurately mark the position of the studs on your wall. Draw long vertical lines that depict the position of each stud.

Install a Starting Guide
Using a scrap 1" x 2" or long piece of wood, find the horizontal position below your first panel. You can secure this starting panel into the wall using drywall screw.

Install your Starting Panel
Rest your first panel on the installation guide making sure it is level. Align your first installation screw and drive it all the way through your board into the stud behind.

Grow your Wall Horizontally
Insert the nylon dowel connectors into the extruded dowel slots in the back. Gently force the panels together making sure that the dowel connectors slide into slots on both panels.

Grow your Wall Vertically
Align the next panel below or above your starting panel. Make sure the press it in place so that the two new panels make a seamless connection.

Cut Panels to Size
FLOW Panels can be cut to size using a table saw. Pieces should be cut to fit hard to reach places, face ends of cabinets or custom fit your FLOW installation.

Finish your FLOW WALL Installation
Your finished FLOW WALL installation. Clean lines, securely attached to your wall. Great organization starts with FLOW WALL.